Robin Hood MOT Bay

Case study

Pit installation

The Project

Removal of an existing vehicle lift and installation of a Premier Class 4 Pit. Manufactured with lights and shaker plates.

The Problem

We had to complete the work in extremely tight logistical parameters. The garage was located in an extremely tight site with a low head height. It was also located down a tight one-way street. Getting the earth away from site, the pit in to the building and installed was extremely tight.

Solution

Our team visited site and discussed the procedures with the end user. Communicated with the neighbouring properties and managed expectations from the start.  Over 35 years’ experience of this type of work was invaluable to the success along with Premier Pits can do attitude.

Outcome

The client and workshop engineers now have a fantastic facility which was installed on time and in budget.

Client:

Robin Hood Garage

Location:

The North

Specification:

Manufacturing and installing of a 5m class 4 pit to be used in a car MOT bay.